New Construction Sod Water Rate Reduction
The District offers a reduced water rate for new construction sod under the New Construction Sod Waiver, subject to the following criteria:
Eligibility Requirements:
- Property must be new construction.
- Irrigated sod area must not exceed 2,500 square feet (subject to inspection).
- Requests must be submitted within one year of the closing date.
During Stage 1 restrictions, new construction sod is limited to a 30-day waiver. After 30 days, all standard Stage 1 watering restrictions apply.
All water used during the three-month waiver period will be billed at the lowest current rate. This rate reduction is available one time per lot.
To request the reduced rate, please contact the District office at 719-495-5152, Monday through Friday, 8:00 a.m. to 5:00 p.m.
